Workbook: DS+R debuts Berkeley Art Museum Pacific Film Archive

Located at the intersection of Oxford and Center Streets, directly across from the UC Berkeley campus, BAMPFA‘s new home integrates the former UC Berkeley Printing plant with a new structure. Totaling 83,000 square feet, BAMPFA features 25,000 square feet of gallery spaces, two film theaters, a performance forum, study centers and an outdoor LED screen. Designed by Diller Scofidio + Renfro, the museum marks the studio’s third California building to open in the past year, following The Broad Museum in downtown Los Angeles and the McMurtry Art and Art History Building at Stanford University.

  • View of the Oxford Street facade, with 1939 Art Deco administrative building at left and new stainless steel. Photo by Iwan Baan.
  • View of Center Street facade with main entrance and cantilevered cafe. Photo by Iwan Baan.
  • View of the main corridor, looking south from the lobby toward the Barbro Osher Theater; ground-floor gallery to the left. Photo by Iwan Baan.
  • Visitors in the ground-floor gallery observing Architecture of Life, BAMPFA’s inaugural exhibition. Photo by Elizabeth Daniels.
  • View of lower-level gallery spaces exhibiting Architecture of Life. Photo by Elizabeth Daniels.
  • View of the ground-floor gallery with view into the cafe corridor above. Photo by Iwan Baan.
  • View from cafe corridor of the ground-floor gallery below. Photo by Elizabeth Daniels.
  • Interior view of the Barbro Osher Theater. Photo by Elizabeth Daniels.
  • Aerial view from the UC Berkeley Campus. Photo by Iwan Baan.

 

Client 
UC Berkeley Art Museum and Pacific Film Archive

Location
2155 Center Street, Berkeley, CA 94704

Building Site Area
82,670 square feet

Design Architect
Diller Scofidio + Renfro

Executive Architect
EHDD

General Contractor
Plant Construction Company

Project Management
UC Berkeley Construction & Design

DS+R Design Team
Partner in Charge: Charles Renfro
Co-Project Leaders: Zoe Small, Anthony Saby
Project Architect: Michael Samoc
Project Team: Charles Curran, Haruka Saito, William Ngo, Mark Gettys

Project Phases
Architect Selection: June 2010
Design Unveiling: September 2011
Groundbreaking: December 2012
Opening: January 31,  2016

Leave a Reply

Your email address will not be published. Required fields are marked *


*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>